Hartle installed all mechanical services to the 147-bedroom hotel to include boosted hot and cold-water services served via gas fired water heaters, which eliminates the need for cylinders and provides instant hot water at mains pressure, as it heats and retains a quantity of water in an insulated cylinder. Ventilation, air conditioning, and above ground drainage were also provided.