Boss Construction Ltd. are a construction company based in Sutton Coldfield.
Hartle provided all mechanical services to the 104 bedroom hotel. This included boosted hot and cold water, to improve performance and flow of water, served via gas fired water heaters; ventilation with heat recovery, a process of continuously preheating incoming cool supply air by warming it with the outgoing air; and full air conditioning.