Accommodation

Travelodge, Greenwich

Travelodge London Greenwich is located in a popular tourist area, close to Cutty Sark and the O2 Arena.
Project Stats
104

bedrooms

5

services

£500

thousand

Travelodge, Greenwich, is part of a movement redevelopment scheme of the area.

Hartle supplied all mechanical services to the 104 bedroom hotel to include: boosted hot and cold water services, served via a district heating system - a system for distributing heat generated in a centralised location for general heating requirements such as space heating and water heating, also serving a low pressure hot water heating system to bedrooms and back of house offices; ventilation; air conditioning to public areas; and above ground drainage.

Charles Edward was founded in 2012 as a construction company to commercial and residential refurbishment and refits, but quickly moved into multi-discipline projects mainly focussed on the redevelopment and reuse of existing properties.

Location
Greenwich, London
Main Contractor
Charles Edward
Services
  • Hot & Cold Domestic Services Systems
  • Air Conditioning
  • Drainage
  • Ventilation Systems
  • Heating Systems
Services Installed
Air Conditioning
Drainage
Heating Systems
Hot & Cold Domestic Services Systems
Ventilation Systems