Commercial

Courtyard Marriott Hotel

Courtyard by Marriott is a new hotel set to open in February 2021 and is a 5 minute walk from London City Airport.
Project Stats
9

months

8

services

£2.5

million

Hartle Ltd provided a full mechanical design and build turnkey package delivered for a new 184 bedroom courtyard Marriott hotel based on POD bathrooms and traditional build FOH and BOH areas.  

Project Scope/Services: Domestic hot & cold water, above ground drainage, rainwater services, VRF air conditioning for bedrooms, mechanical heat recovery ventilation, LTHW heating, dry risers and building energy management system.



 

 

Location
London City Airport
Main Contractor
RG Group
Services
  • Hot & Cold Domestic Services Systems
  • Air Conditioning
  • Drainage
  • Ventilation Systems
  • BMS & Controls
  • Hot & Cold Water
  • Low Temperature Hot Water System
  • Above Ground Drainage
  • Building Energy Monitoring System
Services Installed
Air Conditioning
BMS & Controls
Compressed Air Systems
Cooling Water
Public Health
Ventilation Systems