Hartle installed a high velocity heating system, the EVO building assembly shop, which creates areas of high pressure to be able to send our conditioned air from ducts at extremely high velocity levels while using only half of the airflow of a regular system. This keeps the temperature of 21˚C +/- 2˚C to the space as required by the process used. Hartle also had to install gas fired warm air cabinets, which are floor mounted warm air heaters; and supplied gas, water and compressed air mains. Plumbing services were then provided to the toilet blocks and rest rooms.
The project was completed on time and within client budget.