Hartle have installed a new cooling water system comprising of 2No new cooling towers, pipework and valve arrangements to serve the stamping press equipment within the press shop area. Additionally, Hartle also installed a new 6bar compressed air pipework system served from the existing compressor house and serving the press equipment, to compress air to desired outlet pressure.