Working with SDC Construction, Hartle provided landlord services to Plant Block 62 at the Solihull Jaguar Land Rover site.
This projected comprised of installing a high velocity heating system, which sends out conditioned air at a high velocity using less airflow than a regular system; gas; compressed air, which is kept under pressure that is greater than atmospheric pressure to power tools; cooling water; and ductwork, which distributes air flow from the air handling unit (AHU).